OpenRail Designer CONNECT Edition

Synchronize Railway

You can access this dialog from the following:

Ribbon: OpenRail Modeling > Rail Topology > Topology Tools > Synchronize Railway

This tool updates the topological model.

A synchronization is needed when:
  • An asset is added or changed
  • A change in the topological model (such as adding a turnout) is committed.